29-June-2010
English, , 1,017kb
If the momentum is maintained, and sustainability through support to operation and maintenance assured, then Timor-Leste should now meet the MDGs for rural water, which was not the case one year ago.
13-April-2010
English, , 8,857kb
The relevance of the WBG strategy waned through the evaluation period, despite being broadly congruent with the country's own aspirations.
25-February-2010
English, , 485kb
Sida’s current regional strategy for cooperation with South East Asia expires at the end of 2009. Sida required an evaluation of the current strategy as an input to the development of a new strategy for the period 2010–2014.
1-November-2009
English, , 1,266kb
A synthesis report of recently completed evaluations of the Australian aid program’s efforts to improve the delivery of basic services for the poor.
6-July-2009
English
The Aid for Trade at a Glance 2009: Maintaining Momentum report presents the results of the second monitoring exercise of the Aid for Trade Initiative and documents its success so far.
30-September-2008
English, , 2,449kb
This independent evaluation of the Timor Leste (TL) country programme was commisionned to provide the Senior Management of IA and the Country Team in Dili with an assessment of the relevance, effectiveness, efficiency and impact of the two Country Strategy Papers.
30-September-2008
English, , 669kb
The project has met or exceeded many of its primary objectives and in doing so has earned a widespread reputation for collaboration, flexibility and integrity.
31-January-2006
English, Excel, 136kb
The present report contains the evaluation of the Indicative Cooperation Programme (ICP) of East Timor (ET) concerning the 2004/2006 period and the correspondant Annual Cooperation Plans (ACP).